There is a mammoth rising from the lake. The new South Integrated Transport Terminal or Terminal Bersepadu Selatan at Bandar Tasik Selatan is scheduled to be opened on 1st January 2011. This bus terminal is bigger than many of the airport terminals in the country. Here’s an exclusive preview of the mega terminal built over part of the lake…

Overview of TBS
The integration part comes from its proximity to the existing ERL, KTM and LRT Stations in Bandar Tasik Selatan. See the long connecting walkway.

The Bridge
A new ramp and bridge connect the terminal from the MRR2.

TBS-BTS
Six floors, 55 bus platforms, 150 taxi bays, 1,000 parking bays and 1,800 seats in air-conditioned waiting halls. Unlike ancient Puduraya, the buses wait at an external bus holding area. So no more free carbon monoxide at the platforms 🙂

The Trains
The three train stations as seen from TBS. City buses will also call alongside the terminal. Taxis and private cars are to pick and drop passengers at a spacious waiting area underneath the building.

Part of the Boarding Area

The Mothership

TBS as seen from the new road linking the Sungai Besi Expressway (SBE)

Southerly Clouds
How To Get There? See MyCen Map of TBS-BTS
Tip: You can view larger versions of the images here, gallery-style. When the page finishes loading, click on any picture. Navigate via the arrows on each side of the frame.
All pictures captured with the Panasonic Lumix DMC-LX5 camera by TV Smith